Arts >> Dance >> Square Dance

The Deming Cycle (PDCA): Continuous Improvement Framework — Plan, Do, Check, Act

The Deming Cycle (PDCA / PDSA) is a four-step iterative framework for continuous process improvement, developed by W. Edwards Deming from Walter Shewhart's work. It's the engine of Lean, Six Sigma, and modern quality management.

The Four Steps

  1. Plan — Define the problem, gather data, analyze root causes, design a testable solution with predictions
  2. Do — Implement the solution on a small scale (pilot). Collect data meticulously.
  3. Check (Study) — Compare results to predictions. Analyze variation. Did it work? Why/why not?
  4. Act — If successful: standardize, scale, document. If not: refine hypothesis, repeat cycle.

Core Principles

Benefits

PDCA vs. PDSA

Deming preferred PDSA (Plan-Do-Study-Act) — "Study" emphasizes learning over mere "Check." Same cycle, deeper epistemology.

Note: Visualize as a circle with four quadrants labeled P-D-C-A (or S). The cycle never stops.

Square Dance

Related Categories