Arts >> Theater >> Playwriting

Lost Formwork in Construction: When the Mold Becomes the Structure

In conventional concrete construction, formwork (molds) is temporary—built, filled, stripped, reused. Lost formwork flips the paradigm: the formwork stays permanently, becoming a structural and/or architectural component.

How It Works

Flexible, durable materials—geotextiles, fiber-reinforced polymers (FRP), stay-in-place metal decks, fabric-formed concrete—are shaped into the desired geometry. Concrete is placed against them. After curing, the formwork remains, bonded to the concrete.

Why Use It?

Applications

The Catch

Requires specialized design expertise: material-concrete interaction, bond behavior, long-term durability, construction sequencing. Not a plug-and-play substitute. But for the right project, it unlocks forms—and economics—conventional formwork can't touch.

Playwriting

Related Categories